[01]
Seven services
Each page explains what you need, how long it takes and which documents to prepare.
01
Legalizing unauthorized works
For violations made up to July 2011. Needed before any property transfer. LAW 4495/2017 · FROM 10 DAYS LAW 4495/2017 · FROM 10 DAYS 02Electronic building identity
The document the notary asks for. After legalization, or straight away if everything is legal. LAW 4495/2017 · FOR THE CONTRACT LAW 4495/2017 · FOR THE CONTRACT 03Building permits
From the first sketches to approval by the building authority (YDOM), with every study in one practice. YDOM PAROS · 3 PHASES YDOM PAROS · 3 PHASES 04Engineer certificates
For a transfer, a parental gift or a loan. Site visit and a check of the file. TRANSFER · PARENTAL GIFT TRANSFER · PARENTAL GIFT 05Construction supervision
On site, in line with the terms of the permit. A schedule and updates for the owner. ON SITE ON SITE 06Topographic surveys
Surveys with EGSA coordinates, for a permit, a legalization or the land registry. EGSA COORDINATES EGSA COORDINATES 07Energy upgrades
Energy performance certificate and upgrade study, for a sale or for the Exoikonomo subsidy programme. EPC · EXOIKONOMO EPC · EXOIKONOMO Not sure which one you need? Send us what you have and we will tell you where to start.
CONTACT