Building permits

From the first sketches to handover. The studies, the approvals and the supervision come from one practice, so you do not coordinate four specialists yourself.

Send us the property
[01]

We design your home with you

DESIGNING YOUR HOME WITH YOU

We get in touch and study the details of your property. We discuss your needs and options, and propose a solution.

The quote includes every study and procedure needed to obtain the building permit.

[02]

How it starts

We arrange a site visit to check whether the property is legal. What follows depends on what we find.

STARTING POINT

Site visit

A check of whether the property is legal, by appointment. From here there are two paths.

IF VIOLATIONS ARE FOUND

Legalization first

If violations are found that qualify for legalization, a surveyor records the property and the legalization process begins. It applies to violations in buildings up to July 2011.

Legalizing unauthorized works
IF EVERYTHING IS LEGAL

Building permit

If everything is legal, we go straight to the building permit process.

CONTINUES IN THE PHASES BELOW
[03]

The three phases

The first two are required. The third happens only if you ask for it.

Phase A7 STEPS

From design to the issue of the permit.

01Topographic survey and calculation of the building ratio, the coverage and the special rules that apply to the area.
02Architectural design begins together with the owner: preliminary drawings, review, feedback and changes to the design.
03Agreement on a design solution and completion of the studies.
04Applications for opinions to the relevant authorities: the Ephorate of Antiquities, the Ephorate of Modern Monuments, the Architecture Council.
05After approval, the studies are submitted to the local planning office for pre-approval.
06Tax clearance, social security (EFKA), structural and mechanical and electrical studies.
07The permit is issued.
Phase BREQUIRED

Permit supervision, a TEE requirement.

Supervision of each phase so the design is built correctly
Building inspector
Checking the safety measures
Compliance with the regulations
Phase COPTIONAL

Optional. Only if the owner asks for it.

Organizing and supervising the crews
Planning the schedule
Cost and technical monitoring of the project
Progress reports to the owner
Phases B and C in detail: Construction supervision IN PRACTICE Restoration of a stone winery, Lefkes. A traditional settlement: opinion from the Ephorate of Antiquities and the Architecture Council, permit and supervision by our practice.
[04] ONE PRACTICE

Every study is done here

You do not need to find an architect, a structural engineer, a mechanical engineer and a surveyor separately, or coordinate four offices that do not talk to each other. The team covers it all, and one person handles the communication.

ARCHITECTURAL

Preliminary drawings and final design.

STRUCTURAL

Load-bearing structure and strengthening.

MECHANICAL AND ELECTRICAL

Building services and energy performance.

TOPOGRAPHIC

Support throughout the process.

[05]

What we need
from you

Title deed and tax ID number
Topographic survey, if there is one
Previous permits and drawings of the property
Land registry declaration and E9 property tax form
Forestry office certificate, where required
Access to the plot for a site visit

If the plot is outside the town plan, whether it is buildable and its road access are checked first. No design work starts before we confirm it can be built on.

[06]

Frequently asked
questions

The studies and the file are the predictable part. Approvals from other authorities, such as archaeology or the forestry office, are not. So the timeline is given as a range and updated whenever something changes.
It depends on the work. Painting, tiles and a new kitchen do not need a permit. Moving walls, changing the elevations, new openings or a change of use do. The check is done before the crew starts, not after a complaint arrives.
Not while it is pending. The unauthorized work is legalized first, and then the new permit goes ahead. The check at the start shows which order works best.
LEGISLATION
Law 4495/2017

Sets out the categories of permits, the issuing procedure and the building inspections.

Law 4067/2012

New Building Regulation. Defines what may be built and on what terms.

e-Adeies

The TEE online system through which permits are issued.

[07]

Send the property address

An address and two photos are enough to start the first check. You will find out what is missing and what it costs, before you commit to anything.

Talk to Anna
ATHENS OFFICE 248 Agiou Nektariou, 16562 Glyfada +30 210 960 9014
PAROS OFFICE Aliki, 84400 Paros +30 22840 90763
MOBILE +30 693 409 9872
RELATED SERVICES Legalizing unauthorized works Supervision and construction Topographic surveys